CN Tower

CN-Tower-1

General Structural Rehabilitation  This project involved structural rehabilitation work at the plenum roof, focused on repairing a damaged heating cable system. The scope included removal of the existing concrete topping, coordination with others for the installation of new heating cables, followed by reinstatement of new concrete topping and waterproofing. During execution, the contract scope was […]

366 Bay Street – Façade Restoration and Window Replacement

Bay-St-2

Window Replacement in Occupied Facility Complete restoration of the east and west facades of the building including stone and brick repair, cleaning and a complete window replacement carried out in an operational building, including installation of all associated flashings and sealants. The project was executed with minimal disruption to daily activities, ensuring building performance and […]

1815 Yonge Street – Balcony Rehabilitation

1850-Yonge-St-2

Exterior Balcony Repairs and Waterproofing Initial localized route-and-seal work was completed in late 2020 ahead of winter conditions. This was followed by surface preparation and full waterproofing of exterior balconies in spring 2021, improving weather resistance and prolonging structural durability.

56 Temperance Street – Exterior Envelope Rehabilitation

56-Temperance-St-3

Exterior Envelope Restoration of a Heritage Building Comprehensive building envelope repairs including masonry restoration, sealant replacement, exterior painting, and lighting system upgrades. This work enhances both the performance and aesthetics of the building exterior.

611 Farmstead – Birkdale Place

611-Farmstead-1

Roof Structure Rehabilitation  This project involved structural repairs to the existing roof structure and the complete replacement of the roofing system. Scope also included specialized access solutions, full weather protection enclosures, structural framing repairs, mechanical system upgrades, and restoration of interior finishes. The work ensured long-term performance, safety, and protection of the building envelope.

100 King Hamilton

100-King-Hamilton-1

Building Envelope Retrofit and Roof-Level Upgrades Full building envelope retrofit using a combination of swing stage and scaffold access, with street-level closures to support hoisting operations. The scope includes curtainwall retrofit and securement repairs, structural steel modifications, and upgrades to mechanical screen walls at the mechanical penthouse roof level. This work enhances building safety, durability, […]

Knollwood Park P.S. Window and Door Replacement

knollwood-park-feature-image

Full Window and Door Replacement – School Project Complete replacement of all windows and doors throughout the school, including removal of existing units, drywall repairs, hardware installation, caulking, and final finishes. This comprehensive upgrade enhances energy efficiency, security, and building performance and was completed in an operational school during the school year. 

4879 Kimbermount Rd, Balcony and Sealant Repairs

4879-kimbermount-featured-image

Comprehensive Exterior Restoration Full building exterior restoration utilizing swing stage access, with overhead pedestrian protection installed at grade. The scope includes structural concrete balcony repairs, waterproofing system installation, and complete sealant replacement. This work improves building safety, longevity, and weather resistance, all while ensuring safe access for occupants and the public.

Allan Gardens Heritage Building Restoration

allan-gardens-feature-image

Historic Facility Restoration and Infrastructure Upgrade This comprehensive project included replacing the granite paver floor system with a structural concrete slab to conceal updated mechanical, electrical, and plumbing services in the existing subgrade tunnels. The steel structure was repaired and reinforced, with lead-based coatings abated and modern finishes applied. All single-pane glazing units were replaced […]