Guelph West Parkade Phase 1-2

The West Parkade is one of Guelph’s municipal parking facilities. HRI completed wholesale sealant and thin system waterproofing installation on the top interior level of multi level pre-cast parking garage. We also completed various structural concrete repairs throughout, as well as other miscellaneous repairs which included; expansion joint replacement, drain replacements, installation of roof deck […]
King St. Parkade

Parking Garage Restoration Project. Structural concrete repairs and localized thin system waterproofing repair throughout the multi-level precast parking garage. Various other misc. repairs including expansion joint repair, crack injection, sealant repair etc.
The Anchorage

The Anchorage is one of Belleville’s most highly sought after condominium buildings. Its garage is composed of a single on grade level, with a conventional slab elevated podium deck level above. HRI completed removal of all of overburden on the suspended slab. We then repaired the structural slab, installed a hot-applied waterproofing system, and finally, […]
Simcoe Street Parkade

The Simcoe St. Parkade is one of the City of Peterborough’s municipal parking facilities. HRI completed structural concrete repairs and localized thin system waterproofing replacement throughout the multi level pre-cast parking garage. Various other misc. repairs including replacing expansion joints, crack injection, sealant repair, stairwell upgrades etc., were also completed.
TCHC Eglinton

The TCHC Eglinton Building is a multi-residential high-rise building located at 220 Eglinton Ave. E. Works included removal of overburden and all underground garage services, full P1 roof slab replacement and reinstatement of garage waterproofing/overburden/and services. Various other miscellaneous repairs within the parking garage, including steel beam replacement and repairs, fireproofing, concrete and drainage repairs, […]
TCHC St. Andrews Phase 1-3

TCHC St. Andrews is a multi-residential high rise building complex located at 2063/2067 Islington Ave. HRI completed removal and replacement of thin system intermediate slab waterproofing. We also addressed localized roof slab overburden removal/replacement for re-application of hot applied waterproofing systems. Various structural concrete repairs, drain replacements, replacement of expansion joints, crack injection and other […]
Wilson Heights

Concrete rehabilitation, waterproofing parking garage restoration project at 750 Wilson Heights Boulevard. Replacement of concrete garage access ramp, including new heating cable system and trench drain. Other miscellaneous repairs including podium deck drain replacement, crack injection, crystalline waterproofing, podium deck waterproofing, asphalt replacement, etc.
TCHC Rowntree

Parking garage restoration project at 2765 Islington Avenue. Works included concrete rehab, thin system waterproofing replacement, hot applied waterproofing, overburden removal/replacement, drainage works, expansion joint replacement, crack injection and various other miscellaneous works.
Mutual

Concrete rehabilitation, waterproofing parking garage restoration project at 145 Mutual Street. Restoration of the parking garage access ramp included concrete repairs, installation or heating cable system, hot applied waterproofing, asphalt, trench drain repairs, etc.
Tim Hortons

Restoration of the Tim Horton’s Centre Stadium in Hamilton. Works on site include, pre-cast cast joint renewal, installation of DSM joints, thin system waterproofing, drain installation, caulking and other miscellaneous works.